Technical capabilities

Services structured around the full groundwater lifecycle.

Daripada penilaian awal hingga sistem beroperasi dan disokong selepas serahan.

01 · Exploration

Groundwater exploration

Kenal pasti potensi air bawah tanah secara sistematik sebelum drilling.

Skop boleh merangkumi site reconnaissance, geological review, electrical resistivity survey, interpretation dan recommendation of drilling points.

Site assessmentSemakan lokasi, akses dan operational need.
Survey planDUMMY: instrument model, line length dan electrode spacing.
InterpretationPotential zones, risk and recommendation.
Technical reportDUMMY: exact report format and endorsement scope.
02 · Construction

Tubewell drilling & construction

Pelaksanaan drilling hingga sistem bersedia untuk digunakan.

Skop tipikal termasuk mobilisation, drilling, casing, well development, pump testing, pump installation dan handover.

Drilling methodDUMMY: rotary / DTH / other applicable method.
Depth & diameterDUMMY: confirmed rig capability and limits.
Pumping testDUMMY: test duration, yield and drawdown reporting.
HandoverSystem explanation and after-sale support.
03 · Compliance

JMG / PBT licensing

Dokumen dan aliran permohonan tubewell yang lebih teratur.

TERA WATER membantu menyusun dokumen sokongan dan proses permohonan mengikut keperluan projek dan pihak berkuasa berkaitan.

DUMMY DETAIL: list of documents, processing timeline, fees and authority-specific conditions must be verified for each state and project.
04 · Water quality

Water treatment plant

Rawatan berdasarkan source water quality dan keperluan operasi.

Design basis sepatutnya merangkumi water analysis, target use, flow rate, operating hours, treatment stages, storage dan maintenance requirement.

Water analysisDUMMY: lab parameters and accredited laboratory.
Process designDUMMY: filtration and treatment stages.
CapacityConfigured around peak and daily demand.
O&MDUMMY: maintenance schedule and consumables.
05 · Energy

Solar-powered tubewell

Pilihan sistem untuk tapak yang memerlukan operasi lebih fleksibel.

Solar sizing perlu mengambil kira pump load, operating hours, water storage, solar exposure dan backup strategy.

DUMMY DETAIL: pump model, panel capacity, controller, battery strategy and warranty terms.
06 · Support

Advisory & after-sale

Sokongan teknikal tidak berakhir selepas sistem diserahkan.

Skop boleh merangkumi troubleshooting, site review, performance checks, maintenance advice dan coordination for corrective work.

Fast responseDUMMY: formal response time / SLA.
System reviewCheck performance against project condition.
MaintenanceDUMMY: preventive maintenance package.
Technical guidanceOptions and next steps explained clearly.
Need a recommendation?

Not sure which service should come first?

Share your location and current water problem. We will help structure the first step.